 | Central Bank wanted to transition from their previous location along Interstate 394 to a more neighborhood location within the City of Golden Valley. Secondly, they required a successful balance between meeting the current needs and planning space flexible enough in terms of size and style to accommodate the bank’s future expansion. The logical place was along Winnetka Avenue, but the challenge was finding an acceptable, available site. After searching for over six months, Master identified a prime site on the corner of Winnetka Avenue North and 10th Street – the northern gateway to Golden Valley’s downtown.
In addition to a careful and thorough design process, Master took great efforts to ensure that the construction implementation fully achieved the design vision. Master selected only highly experienced subcontractors who had a firm commitment to achieving the intent of a Class A office building.
Beginning with the demolition of the existing office/warehouse structures on the site in early summer, construction was completed five months later with delivered to the client on time and within budget. 
| More Showcase Projects:
| | |
| Greenleaf Lofts: 2000 Nicollet Ave, Minneapolis, MN 27 units or residential condominiums and 7,200 sq ft of retail space » Click here for more info. |
| Quick Facts:
Property Location: 945 Winnetka Ave N Golden Valley, MN
Property Type: Office Size: 18,000 Sq. Ft. Partial Tenant List: Central Bank Master Services Used: Owners Rep - Real Estate Civil Engineering Sitework Construction Building Construction
|
| Master: Engineering, Real Estate & Construction
125 West Broadway Ave, Suite 100 Minneapolis, MN 55411 P: (612) 872-9200 F: (612) 872-9201
|
|